4-26
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 11 - Air Temperature Trending Screen (optional)
To access the Air Temperature Trending Screen (Screen 11):
1
Press the "Air Temp." button
located in the center of the Trending Screen
(Screen 8).
The Air Temp. Trending screen allows the user to view the air temperature (F°) trend
vs. time at five (5) locations in the EnergySmart Dryer. The air temperature reading
locations are denoted by various colors. The colors associated with the locations are:
Yellow
= Hopper Dry Air Inlet Temperature
Blue
= Hopper Outlet Temperature
Purple
= Dewpoint trending screen
Light Green = Dry Air Heater On Time %
Orange
= Regeneration Temperature (within the Dryer)
The Air Temp. Trending screen shows a snap shot of the last two (2) hours of opera-
tion and records and saves trending data for the last 72-hour period. The scroll but-
tons near the bottom of the screen allow the user to scroll back to an earlier time or
forward to the present time, plus jump to the present time from any time within the
trending record.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...