Installation of the HTC Control
(continued)
(Model HTC 120)
CAUTION:
You are responsible for the structural integrity of this
installation.
1
Securely bolt the HTC control to the left side of the floor stand.
Use the
supplied locking fasteners to securely mount the HTC control center to the floor
stand to prevent vibration-induced loosening.
NOTE:
If, by using your own provisions, you change the mounting arrangement of the con-
trol center to a wall mount unit, it must be mounted 6 inches {152.4 mm} off of the wall to
provide clearance for the heat sink.
Installation of the HTC Control
(continued)
(Models HTC 180 and 270)
CAUTION:
You are responsible for the structural integrity of this installation.
1
Move the control center into
its final location for operation
(see figure to the right). The
control center must be posi-
tioned close enough to the
hopper to allow connection of
the RTD temperature probe.
The control center can be
mounted to a wall, the hopper
frame or a floor stand with
customer supplied provisions.
NOTE:
If, by using your own provisions, you change the mounting arrangement of the con-
trol center to a wall mount unit, it must be mounted 6 inches {152.4 mm} off of the wall to
provide clearance for the heat sink.
✐
HTC Control Center
(Free-Standing)
✐
HTC Control
Center
✐
NOTE:
If the lengths of the process
and process protection RTD wiring
are too short for your installation,
contact Conair Parts Department
(800.458.1960) to purchase
extension cables. From outside the
United States, call 814.437.6861.
(continued)
3-10
l I n s t a l l a t i o n - G e n e r a l
NOTE:
If using a GasTrac for the
drying system heat source,
see
Installation section entitled,
Installing the CH Hopper Cone
Section.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...