3-52
l I n s t a l l a t i o n - M a i n Po w e r C o n n e c t i o n s
Connecting Main Power to the
Dr yer
CAUTION:
Always disconnect and lock out the main power sources before making
electrical connections. Electrical connections should be made only by qualified
personnel.
1
Open the dryer’s electrical enclosure.
Turn the disconnect dial on the dryer
door to the Off or “O” position. Turn the captive screw and swing the door open.
2
Insert the main power wire through the knockout in the side of the enclo-
sure or the rear of the dryer
(the dryer’s electrical wire connection location
was a factory option and may be connected through the front or the rear of the
dryer). Secure the wire with an appropriately-sized strain relief.
3
Connect the power wires to the three (3) terminals at the top of the power
disconnect holder.
4
Connect the ground wire to the ground lug as shown in the photo.
IMPORTANT:
Always refer
to the wiring diagrams
that came with your
EnergySmart Dryer before
making electrical
connections.
ON
O
O
FF
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...