Using the OptiMizer™
(continued)
Once the Dynamic Tune process is complete and the system has reached the opti-
mal settings for the first time using this recipe, a message will be displayed
prompting the operator to save changes to the current recipe. This message is
shown below. The Dynamic recipe setpoints should then be changed to match the
current operating parameters, and the recipe configured as Optimized and then
saved. Once a recipe has been changed, it has to be downloaded in order for the
changes to take place in the OptiMizer™ controller. This procedure is described
in the ‘Recipe Setup and Management’ section. However, if the system is current-
ly running, it is not necessary to download the newly changed and saved recipe to
the controller. A download is only required for the next system startup. On the
next system startup, the Optimized recipe can be downloaded and the system will
operate as described below.
After the Dynamic Tune process is complete, the message below will alert the
operator that the system is Optimized and the recipe should be updated. This mes-
sage is displayed and should be acknowledged like an alarm.
Optimized Message
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...