4-106
l O p e r a t i o n
Using the OptiMizer™
(continued)
Example Recipe for a W1000 System
The following table shows an example of an Optimized recipe for a W1000
Dryer with a 64” hopper.
CAUTION:
This is an example recipe only, in order to create an Optimized recipe for
any system, the steps outlined in this manual must be followed.
Starting OptiMizer™ on Already Running System
The OptiMizer™ function can be started on a system that is currently running.
An operator can download an Optimized or non-Optimized recipe from the
Recipe screen. Depending on the current state of the system temperatures,
material usage, and Optimized status of the recipe, the system will react in sev-
eral ways when the OptiMizer™ is enabled.
1
System Running, Temperatures below setpoints, no material usage:
In this case, the system will go through the Pre-dry steps and through the
OptiMizer™ functions as described above. This is basically the same as the
cold start scenario described above.
Name
Recipe
Setpoint
Pre-dry Airflow (%)
90
Pre-dry Airflow Flow (CFM)
500
Pre-dry Temperature (°F)
350
Dynamic Airflow (%)
75
Dynamic Airflow Flow (CFM)
500
Dynamic Temperature (°F))
350
Cool Down Temperature (°F)
200
Material Target Temperature (°F)
330
Material Maximum Temperature (°F)
375
Optimized
1 (Yes)
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...