3-108
l I n s t a l l a t i o n - Te s t i n g
Testing the Secondar y Receiver
(optional) (continued)
6
Press the “Enable” button on the Secondary Hopper Loader Screen
(Screen 18) to activate the secondary receiver.
If everything is installed correctly:
•
The Positive Displacement Pump will turn on for the duration of the
load time set at this screen.
•
The purge valve will purge the conveying line (if supplied)
•
The discharge valve of the receiver will open at the end of the load
cycle time for the duration of the dump time set at this screen.
7
Press the “Disable” button on the Secondary Hopper Loader Screen
(Screen 18) to deactivate the secondary receiver.
If everything is installed correctly the following sequence will occur:
•
The Positive Displacement Pump will turn off (unless idle mode
equipped)
•
The discharge valve of the receiver will close
•
The purge valve will deactivate (if supplied)
8
After the test has been completed successfully,
properly shut down the
dryer,
see Operation section entitled, Stopping the EnergySmart Dryer
System.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...