![Conair HTC 120 Скачать руководство пользователя страница 311](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067311.webp)
Tr o u b l e s h o o t i n g l
6-25
6
Tro
ub
le
sh
oo
tin
g
Passive Alarms
If an alarm occurs, a red dialog box is displayed on the dryer’s touch screen
control. The dryer continues to operate, but this problem could prevent cor-
rect drying of your material. The dialog box will indicate whether the alarm
is a shut down alarm or a passive alarm.
Problem
Process Material
Temperature High
Process Material
Temperature Low
Dry Air GasTrac General
Alarm
Dry Air Electrical Heat
Booster General Alarm
Dry Air Process Flow Sensor
Alarm
Possible cause
Process material temperature setpoint is
above the alarm setpoint.
The drying monitor probe is not accu-
rately reading the temperature.
Process material temperature setpoint is
below the alarm setpoint.
The drying monitor probe is not accu-
rately reading the temperature.
The GasTrac is not operating properly.
The Hopper Temperature Controller
(HTC) is not operating properly.
The flow sensor is damaged or not func-
tioning properly.
Faulty wiring.
Solution
Increase the process material tempera-
ture alarm setpoint if it is too close to the
delivery temperature setpoint.
Replace the drying monitor probe.
Decrease the process material tempera-
ture alarm setpoint if it is too close to the
delivery temperature setpoint.
Replace the drying monitor probe.
Refer to the GasTrac’s manual for trou-
bleshooting.
Refer to the Hopper Temperature
Controller’s (HTC’s) manual for trou-
bleshooting.
Replace the flow sensor.
Diagnose and correct wiring problems.
Refer to the wiring diagrams supplied
with the EnergySmart Drying System.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...