3
In
st
al
la
tio
n
Connecting the Conveying Lines to
the Vacuum Pump(s) and Dust
Collector(s)
(optional)
1
Connect the vacuum line from the optional receiver to the air inlet of the
optional dust collector.
2
Connect the vacuum line from the dust collector’s air outlet to the vacuum
pump’s air inlet.
3
Repeat Steps 1 and 2 if a second optional receiver, dust collector and vacu-
um pump are to be used.
Make sure all hoses are securely clamped to
prevent wasteful leaking. The hoses should be
routed neatly and supported where possible to
prevent undue stress. Also, the bends should
be made with gradual radiuses. Sharp turns
will cause undue pressure drops.
Air Inlet
Air Outlet
Collection Chamber
Floor Stand
To Material Supply
NOTE
: Vacuum pump shown above is 180º out of position.
✐
NOTE:
Do not allow
the flexible hoses to
kink or crimp.
✐
I n s t a l l a t i o n - M a i n Po w e r C o n n e c t i o n s l
3-61
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...