3-8
l I n s t a l l a t i o n - G e n e r a l
Positioning the CH Hopper Floor
Stand
WARNING:
You are responsible for the structural integrity of this installation.
CAUTION:
Care should be taken while moving the main CH Hopper floor stand and
sections to ensure that no damage occurs during assembly.
I
MPORTANT:
You will need to consider the installation of your entire dryer system
before permanently placing any system component,
see Installation - Piping and
Hoses for reference.
Due to the varying size of Conair CH Hoppers, Conair recommends:
•
Following all applicable local building and safety codes
1
Make sure the installation location for the CH Hopper meets all provisions for
clearances, will support the weight of the fully loaded hopper and provides
space for the installation of the other system components, such as optional
receivers.
See the specifications and drawings supplied with your system for
details.
2
Using a forklift, hoist or crane, move the floor stand to its installation location.
NOTE:
For EnergySmart Dryer
Systems supplied with "small"
hoppers, the floor stand and cone
section may be pre-assembled
from Conair.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...