4-88
l O p e r a t i o n
Using the OptiMizer™
(continued)
Machine Run Selection/Material Usage Graphs
The Machine Run Selection/Material Usage chart shows how the OptiMizer™
detects material usage. The top graph illustrates the digital input from the extruder
or molding machine selection, and the bottom graph shows how the OptiMizer™
uses material temperature signal from the Conair RTD to determine material
usage.
At the completion of the OptiMizer™ Delay, the system will go into the Dynamic
Tune Down/Tune Up mode, during which the system begins to make adjustments
towards an Optimized state. Since this is a non-Optimized recipe, the system will
be seeing these variables for the first time. The adjustments are made in a prede-
termined order, in small steps over lengthy time intervals. This is by design so that
the system can slowly work towards the optimal settings without compromising
the integrity or usability of the resin.
NOTE:
If this machine run signal is lost during OptiMizer™ operation, the system
returns to the Pre-dry system settings and mode of operation. This is done in order to
protect the integrity of the resin.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...