Angled Probe
Allows the DM-II to be used on
hoppers that have insufficient
clearance for correctly mounting
the probe around loading devices.
Probe Mounting
Adapter Kit
(Includes half coupling,
two mounting plates,
screws and gasket)
NOTE
:
The mounting adapter
kit will only be included if the
DM-II was ordered as a retro-
fit kit. Otherwise, the adapter
plate will already be in place
on the hopper.
The DM-II package includes:
●
Drying monitoring probe
●
Connecting cable
●
Pre-wired dryer panel
●
Light tower
Specifications: Dr ying Monitor, DM-II
Model
✐
SPECIFICATION NOTES:
Specifications can change without notice. Check with a Conair representative for the most current information.
Drying Hopper #
Conair Part #
CH 54-70
1819080140
CH 54-85
1819080141
CH 54-99
1819080142
CH 54-114
1819080123
CH 54-129
1819080143
CH 64-158
1819080125
CH 64-187
1819080126
CH 64-215
1819080127
CH 64-248
1819080144
CH 74-245
1819080126
CH 74-366
1819080145
CH 100-450
1819080132
CH 100-675
1819080133
CH 100-900
1819080134
2-12
l D e s c r i p t i o n
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...