6
Tro
ub
le
sh
oo
tin
g
Tr o u b l e s h o o t i n g l
6-39
Replacing the Desiccant Wheel
Motor
(W600 - 1000)
1
Stop the dryer, disconnect and lockout the main power.
2
Remove both side panels.
3
Disconnect wiring to the motor.
4
Remove the pivot bolt securing the belt tensioner to the motor bracket.
Be sure to retain the flat washers located between the tensioner and bracket.
Disconnect the spring and remove the tensioner.
5
Remove the belt from the motor pulley,
then remove the pulley from the
motor.
6
Remove the screws securing the motor to the upper and lower bracket,
and remove the motor.
7
Secure the new motor to the bracket.
8
Install the pulley on the new motor,
and position the belt on the pulley.
9
Connect the spring to the tensioner, then secure the tensioner to the
motor bracket.
Be sure to install flat washers between the motor bracket and
the tensioner.
10
Connect the wires to the motor.
11
Connect the power to the dryer.
Turn the dryer on and ensure that the
desiccant wheel is rotating in the correct direction.
12
Replace the side panels.
ON
O
O
FF
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...