![Conair HTC 120 Скачать руководство пользователя страница 196](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067196.webp)
4-54
l O p e r a t i o n
Energ ySmart Dr yer System Security
Levels
There are three (3) security levels within the EnergySmart Dryer System control avail-
able to the customer. The EnergySmart Dryer System is shipped with the password
security level set at "Supervisor". For information on how to change security levels,
contact you Conair Technical Service representative.
The following table and accompanying text gives an overview of the security levels
and description of the functions available at each level.
DEFAULT (Default) Level A
•
Start and stop at the system level
•
Start and stop individual equipment
OPER (Operator) Levels A & B
•
Change date and time
•
Start and stop at the system level
•
Start and stop individual equipment
•
Change operating setpoints
•
Change alarm setpoints
EnergySmart™ PET Drying System Security Levels
Security Codes Levels
A B C
DEFAULT
Level A
!
OPER
Levels A & B
! !
SUPER
Levels A, B, & C
! ! !
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...