![Conair HTC 120 Скачать руководство пользователя страница 317](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067317.webp)
6
Tro
ub
le
sh
oo
tin
g
Tr o u b l e s h o o t i n g l
6-31
Poor Material Dr ying
Troubleshooting
(continued)
Residence Time
- The time your material supplier has determined that the material
in use must be heated to its drying temperature to achieve proper drying.
Problem
Material residence time is
too long or short.
Possible cause
Material level in hopper is too low.
Material throughput is too high.
Solution
Make sure there is an adequate supply of
material to feed the loader on top of the
drying hopper.
Correct any problems with the convey-
ing system that may be preventing your
loader from filling the hopper.
If your hopper has a level sensor for
maintaining a material level less than
completely full, be sure this sensor is
adjusted properly.
Take any necessary steps, such as slow-
ing down the process, to ensure the
material usage is within design specifi-
cations of the dryer and hopper.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...