4
O
p
er
at
io
n
O p e r a t i o n l
4-91
Using the OptiMizer™
(continued)
OptiMizer™ Setup
Before the OptiMizer™ function is started, the operator should confirm that the
setup parameters are set properly. These parameters are factory set at predeter-
mined default settings and normally do not need changed. However, it is impor-
tant to become familiar with these settings and confirm they are set accordingly.
The actual OptiMizer™ enable is on the ‘System Control’ HMI screen. On this
screen the Enable/Disable OptiMizer™ button is at the bottom of the screen as
shown below. When the OptiMizer™ is enabled, the system performs the func-
tions associated with the OptiMizer™. The OptiMizer™ needs to be disabled
when manual dryer operation is desired.
System Control Screen
In order to find the OptiMizer™ settings screens on the ES1 control HMI:
1
Go to the Login screen.
2
From the Login screen,
login under the “Super” level user name and pass-
word.
3
Use the following navigation button path
Setup
>
Main Setup > Equipment
Setup
>
OptiMizer™. This navigation path is shown on the following screen
shots.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...