I n s t a l l a t i o n - P i p i n g / H o s e s l
3-47
Location of the Process Material
Temperature Probe (RTD)
The EnergySmart Dryer control is configured to utilize data from an RTD probe,
located within your system, which senses the temperature of the process material
leaving the CH Hopper. However, the EnergySmart Dryer System does not pro-
vide a location for a material temperature probe. Therefore, the process material
temperature probe must be incorporated downstream of the CH Hopper and within
your delivery system.
Conair recommends that you check the throat of the machine to which your mate-
rial is being delivered for an existing tap location that can be used to mount the
RTD. If none exists, a second option is to incorporate RTD mounting capabilities
into the piping/flange that will connect to the bottom of the CH Hopper after the
slide gate.
Conair recommends locating the RTD probe, when possible, within 30 ft {9.15 m}
of the EnergySmart Dryer.
NOTE:
If the length of the supplied RTD cable is too short for your installation, route the
cable into a junction box then connect additional twisted pair wire cable of the appropri-
ate length. Route the added cable to the EnergySmart Dryer control panel.
✐
Junction boxes are available
from Conair.
Contact Conair Parts
(800) 458 1960
From outside of the
United States, call:
(814) 437 6861
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...