![Conair HTC 120 Скачать руководство пользователя страница 244](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067244.webp)
4-102
l O p e r a t i o n
Using the OptiMizer™
(continued)
New Recipe Name Entry Popup
The New Recipe Name popup will be displayed when the ‘Upload and Create’
button is pressed. In this popup, the word ‘unit’ is used instead of ‘recipe’; that is
the default term from the HMI Panel software and cannot be changed by Conair.
Press the ‘Edit (F2)’ button and enter the name of the new recipe. After the name
has been entered, press the enter button and the name will be saved. Then after the
name has been saved, make any changes necessary to the recipe and press the
‘Save Recipe’ button. This will save the recipe in the HMI for future use.
When pressed, the setpoints currently stored in the con-
troller will be uploaded to the HMI and displayed in the
bottom display of the screen in the ‘Current’ column.
Using these setpoints, a new recipe is created. After the
button has been pressed, the operator will be asked to
name the recipe. The operator can then change any of
the setpoints and save the new recipe.
When pressed, the newly created or updated recipe is
saved.
Downloads the setpoints from the currently highlighted
recipe in the top recipe display to the controller.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...