4-22
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 7 - Drying Monitor Screen
To access the Drying Monitor Screen (Screen 7):
1
Press the "Drying Monitor" button
located on the right side of the screen.
The "Drying Monitor" screen provides the user with the current information for the
system’s hopper. The information provided on this screen includes the temperatures at
various levels within the hopper, the outlet air temperature from the hopper and the
process material temperature leaving the hopper.
The Drying Monitor screen also provides the user with the process material high and
low temperature alarm setpoints. If the user is logged-in at the proper security level,
the process material high and low temperature alarm setpoints can be changed on this
screen.
The "DM Trending" button on this screen gives the user instant access to the Material
Temperature Trending screen (Screen 9).
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper securi-
ty level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used
to change the setpoint.
See
Operation section entitled,
Example Set Point Change.
After
the new setpoint value has been
entered, press the
"Enter"
key to
lock in the new setpoint.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...