4-52
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 37 - Alarm Setup 1 Screen
To access the Alarm Setup 1 Screen (Screen 37):
1
Press the "Alarm Setup 1" button
located on the right side of the Main Setup
Screen (Screen 19).
The Alarm Setup 1 screen provides the user with a summary of the low and high set-
point, deadbands and the units of measurement associated with each of the following
alarms:
• Process Air Flow
• Process Filter Pressure
• Process Material Temperature
• Process Dew Point
If the user is logged-in at the proper security level, all setpoints contained on this
screen can be changed using the pop-up keypad window.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper security
level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used to
change the setpoint.
See Operation
section entitled, Example Set Point
Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...