4
O
p
er
at
io
n
O p e r a t i o n l
4-107
Using the OptiMizer™
(continued)
2
System Running, Temperatures below setpoints, material usage:
In this case, the system will skip over all of the Pre-dry steps and go into the
Dynamic Delay step and through the OptiMizer™ functions as described
above. Since the temperatures were not above the setpoints, using the
OptiMizer™ in this fashion will probably result in poor performance and is
not recommended.
3
System Running, Temperatures above setpoints, no material usage:
The system will skip over the Pre-dry steps and go into the Dynamic Delay
step immediately as the Machine Run signal is satisfied. Then the system pro-
ceeds through the OptiMizer™ function as described above.
4
System Running, Temperatures above setpoints, material usage:
The system will skip over the Pre-dry steps and go into the Dynamic Delay
step and proceed through the OptiMizer™ function as described above.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...