4
O
p
er
at
io
n
O p e r a t i o n l
4-59
Starting the Energ ySmart Dr yer
System
(continued)
Without OptiMizer
TM
Mode
6
Navigate to the Process Heater: Dehumidified Air Circuit Screen
(Screen 3) within the dryer’s control.
7
Enter the Pre-dry Delivery Air Temperature that is to be used with your
material.
Pre-drying temperatures are specific to the type of material that is
processed, consult your material supplier for recommended pre-drying
temperatures.
(continued)
NOTE:
Screen 3 shows the type of
heater installed in the Dehumidifying
Drying Circuit of the EnergySmart
Dryer System. If a GasTrac has been
installed, the image on the screen will
reflect a gas heater (flame). If an HTC
has been installed, the image on the
screen will reflect an electric heater
(heating coil). The screen used in this
example reflects an electric heater
(heating coil).
✐
NOTE:
Set points boxes are white with
heavy black borders. Set points can
be changed, if the user has logged in
at the proper security level, by press-
ing the setpoint boxes. This will launch
a pop-up keypad window that can be
used to change the setpoint.
See
Operation section entitled, Example Set
Point Change.
After the new setpoint
value has been entered, press the
"Enter"
key to lock in the new set-
point.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...