Checking for Proper Air Flow
IMPORTANT:
This procedure must be performed before loading material into the
hopper.
CAUTION:
If the air flow direction is incorrect due to improper phase connection,
material from the hopper can be pulled back into the dryer, causing permanent
damage to this equipment.
Opening and Closing the Dryer Doors (W1600 - 5000)
To unlock the side panel door bolts:
1
Rotate the two (2) locking door bolts on the dryer door counterclockwise
with a regular screw driver.
2
Close the dryer doors and rotate the two (2) locking door bolts clockwise
to resecure the dryer doors.
Testing for Proper Rotation
1
Turn on the main power to the dryer.
Make sure the dryer’s disconnect dial is in
the ON position. This powers up the control and the display will illuminate.
3-96
l I n s t a l l a t i o n - Te s t i n g
Dryer Door
Locking Bolts (2)
(W1600-5000)
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...