I n s t a l l a t i o n l
3-1
Installation
Installation - General . . . . . . . . . . . . . . . . . . . . . 3-5
Unpacking the EnergySmart™ Dryer System
components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6
Preparing for installation . . . . . . . . . . . . . . . . . . . . . . . 3-7
Positioning the CH hopper floor stand . . . . . . . . . . . . . . 3-8
Installation of the HTC control
(Models HTC 30, 60 and 90) . . . . . . . . . . . . . . . . . 3-9
(Models HTC 120) . . . . . . . . . . . . . . . . . . . . . . . . 3-10
(Models HTC 180 and 270) . . . . . . . . . . . . . . . . . 3-10
Location and mounting of the HTC heater assembly
(Models HTC 30, 60 and 90) . . . . . . . . . . . . . . . . 3-11
(Models HTC 120) . . . . . . . . . . . . . . . . . . . . . . . . 3-11
(Models HTC 180 and 270) . . . . . . . . . . . . . . . . . 3-11
Installing the CH hopper cone section . . . . . . . . . . . . . 3-12
Installing the CH hopper door, upper and lid sections . . 3-13
Installing the cyclone (optional) . . . . . . . . . . . . . . . . . . 3-17
Installing the drying monitor probe . . . . . . . . . . . . . . . 3-22
Installing the receiver(s) (optional). . . . . . . . . . . . . . . . 3-25
Installing the purge valve(s) (optional) . . . . . . . . . . . . . 3-25
Installing the modular distribution box(s) (optional) . . . . 3-25
Securing the CH hopper to the floor . . . . . . . . . . . . . . . 3-26
Location and mounting of the GasTrac heater . . . . . . . . 3-27
Location and mounting of the dust collector (optional) . . 3-28
Location and mounting of the vacuum pump(s)
and dust collector(s) (optional) . . . . . . . . . . . . . . . 3-30
Po s i t i o n i n g t h e d r y e r o n t h e f l o o r . . . . . . . . . . . 3 - 3 1
R e m o v i n g t h e c a b l e t i e f r o m t h e d e s i c c a n t
w h e e l ( W 6 0 0 - 1 0 0 0 m o d e l s ) . . . . . . . . . . . . 3 - 3 1
S E C T I O N
3
3
In
st
al
la
tio
n
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...