Installing the Cyclone
(optional) (continued)
9
Bolt the third piece of 90 degree tubing to the assembly in Step 8 using the
supplied hardware.
The third piece of 90 degree tubing should be bolted to
the end of the assembly in Step 8 that DOES NOT have the dew point return
port. Be sure to place the supplied gasket between the two (2) pieces of tubing
before tighten the tube bolts.
10
Loosely bolt the now finished tubing assembly to the CH Hopper’s return
air outlet and to the cyclone’s air inlet, using the supplied hardware.
Be
sure to place the supplied gaskets between the tubing assembly and the CH
Hopper outlet and cyclone air inlet before tightening bolts. Mounting location
is dependent upon the installation location of the cyclone.
I n s t a l l a t i o n - G e n e r a l l
3-19
3
In
st
al
la
tio
n
Dew Point
Return Port
Gasket
Gasket
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...