3-20
l I n s t a l l a t i o n - G e n e r a l
Installing the Cyclone
(optional) (continued)
11
Be sure to make any adjustments necessary to the cyclone or tubing
assembly.
12
Tighten all bolts within the cyclone and tubing assemblies with an
appropriately-sized wrench.
13
Locate the 45 degree piece of tubing.
14
Bolt the 45 degree piece of tubing to the outlet of the cyclone using the
supplied hardware.
Be sure to place the supplied gasket between the tubing
and the cyclone outlet before tightening bolts. Mounting orientation is depend-
ent upon your system’s configuration.
15
Bolt the straight piece of tubing to the assembly in Step 14 using the sup-
plied hardware.
Be sure to place the supplied gasket between the two (2)
pieces of tubing before tighten the tube bolts.
45 Degree
Tubing
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...