4
O
p
er
at
io
n
O p e r a t i o n l
4-77
Using Dr yer Recipes
(optional) (continued)
Updating Dr yer Recipes
To update a dryer recipe:
1
Navigate to the Recipes Screen (Screen 15).
2
Highlight the recipe to be updated by using the up and down arrows
located
to the right of the main recipe selection window.
3
Press the “View Recipe” button.
The recipe’s parameters will be shown in the
lower window of the Recipe Screen. Use the up and down arrow buttons located
to the right of the recipe parameter window to view additional setpoints.
4
Use the up and down arrows located to the right of the recipe parameter
window to highlight specific recipe parameters.
5
Press the “Enter” button located to the right of the recipe parameter window
to activate a pop-up keyboard window.
6
Enter the new parameter setpoint using the keyboard window and then press
the “Enter” button.
The new setpoint will now be displayed in the recipe’s
parameters.
7
Repeat Steps 4, 5 and 6 for each required setpoint.
8
Press the “Save Recipe” button to save all changes to the recipe.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...