Replacing the Regeneration Heater
(W1600 - 2400)
(continued)
8
Slide the original insulation over the new heater,
or if the insulation was cut
for removal, wrap the cut insulation sleeve around the new heater tube and
secure it with heat tape.
9
Make sure the cable end of the new heater tube is to the bottom, then
connect the hoses to the top and bottom of the heater tube
and resecure
with pressure clamps and the lower heater tube bracket that was removed in
Step 5.
10
Connect the high temperature switch cable to the quick disconnect.
11
Route the heater power wires into the junction box, and connect them to
the supply leads from the control box.
Refer to the wiring diagram for spe-
cific connection information.
12
To ensure all connections are correct, measure the resistance as in Step 3.
You should measure the readings as noted for a good heater.
13
Close the side panel of the dryer.
14
Connect the dryer to power and turn it on.
Verify the regeneration tempera-
ture achieves the setpoint.
M a i n t e n a n c e l
5-27
5
M
ai
n
te
n
an
ce
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...