![Conair HTC 120 Скачать руководство пользователя страница 304](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067304.webp)
Problem
System Start Failed
System Stop Failed
System Cool Down Done
Dryer Blower Comms Read
Error
Possible cause
A component(s) within the EnergySmart
Dryer system has failed to start after a
system start.
A component(s) within the EnergySmart
Dryer system has failed to stop after a
system stop.
The EnergySmart Dryer system has
properly cooled down before shutting
down.
The variable frequency drive (VFD) on
the dryer has been turned off.
Faulty wiring.
Device did not accept the command.
Incorrect Modbus address.
Solution
Determine which component(s) within
the EnergySmart Dryer system did not
start and troubleshoot the component(s).
Determine which component(s) within
the EnergySmart Dryer system did not
stop and troubleshoot the component(s).
This is a normal operating condition.
Turn on the variable frequency drive
(VFD).
Diagnose and correct wiring problems.
Refer to the wiring diagrams supplied
with the EnergySmart Drying System.
Check the baud rate, data bits, parity and
stop bits (9600, 8, N, 1).
Correct the Modbus address.
See
Operation section entitled, EnergySmart
Dryer System Modbus Communications.
6-18
l Tr o u b l e s h o o t i n g
Passive Alarms
If an alarm occurs, a red dialog box is displayed on the dryer’s touch screen
control. The dryer continues to operate, but this problem could prevent cor-
rect drying of your material. The dialog box will indicate whether the alarm
is a shut down alarm or a passive alarm.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...