4
O
p
er
at
io
n
O p e r a t i o n l
4-17
Control Function Descriptions
(continued)
Screen 2 - System Overview Screen
To access the System Overview Screen (Screen 2):
1
Press the "System Overview" button from the Login Screen,
after logging-in to
the EnergySmart Dryer Control.
The System Overview screen provides the user with the current information for all
components within the EnergySmart Dryer including the hopper, the Dehumidifying
Drying circuit (optional cyclone separator, optional dust collector, dryer, GasTrac or
HTC heater). The information provided by this screen includes the temperature at var-
ious levels within the hopper as well as temperatures, dew points, differential pres-
sures, and air flow rates of the air circulating within the system.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE
: When a "Magnifying
Glass" icon appears on any
screen within the EnergySmart
Dryer control, touching the
icon will take the user to
screens that contain more spe-
cific information concerning
that component. These
screens also allow the user to
turn system components on or
off and to enter setpoints.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...