![Conair HTC 120 Скачать руководство пользователя страница 174](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067174.webp)
4-32
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 17 - Auto Start Screen
To access the Auto Start Screen (Screen 17):
1
Press the "Auto Start" button
located on top right side of the System Control
Screen (Screen 16).
The Auto Start screen allows the user to set the start date and time of the EnergySmart
Dryer System. If the user is logged-in at the proper security level, the start time (hours
and minutes) and date (month, day and year) can be changed from this screen. Once
the correct start time has been entered, press the “Armed” button to activate the Auto
Start function. Pressing the “Disarmed” button will de-activate Auto Start. The Auto
Start function’s current status will be displayed on the right side of this screen.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
NOTE:
Set points boxes are white
with heavy black borders. Set
points can be changed, if the user
has logged in at the proper securi-
ty level, by pressing the setpoint
boxes. This will launch a pop-up
keypad window that can be used
to change the setpoint.
See
Operation section entitled,
Example Set Point Change.
After
the new setpoint value has been
entered, press the
"Enter"
key to
lock in the new setpoint.
✐
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...