4-48
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 33 - Test Outputs Screen
To access the Test Outputs Screen (Screen 33):
1
Press the "Test Outputs" button
located on the Equipment Setup screen
(Screen 20).
The Test Outputs screen allows the user to test the functionality of the following
outputs:
•
Regeneration blower
• Loader 1 (Load)
• Regeneration solid state relay (SSR)
• Loader 1 (Discharge)
• Desiccant wheel
• Loader 1 (Material)
• Isolation contactor
• Vacuum pump
• Process blower
• Loader 2 (Load)
• Process heater -GasTrac/HTC (Start)
• Loader 2 (Discharge)
• Process heater (Stop)
• Loader 2 (Material)
• Alarm light (Red)
• Vacuum pump 2
• Alarm horn
To test an output, first press the “Test Mode Disable” button to change to test mode
enabled.
1
Press the button of the output to be tested.
The output will turn on and remain
on until the button is pressed again. The user can also view the other system
parameters, start the system, stop the system, initiate a system Cool Down or return
to the "Login" screen by pressing the applicable buttons on the right of the screen.
(continued)
NOTE:
The test outputs function
will be disabled when the dryer
system is operating normally.
✐
WARNING:
The EnergySmart
Dryer should be adjusted and
serviced only by a qualified
technician who is familiar
with construction and
operation of this type of
equipment.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...