3
In
st
al
la
tio
n
I n s t a l l a t i o n - M a i n Po w e r C o n n e c t i o n s l
3-55
Connecting Main Power to the HTC
(continued)
(Models HTC 180 and 270)
(continued)
6
Insert the customer-supplied heater power wire through a knockout in the
side or bottom of the control center.
Secure the wire with an appropriately-
sized strain relief, if conduit is not used.
7
Connect the heater power wires to the control center’s terminal block and
heater ground wire to the ground lug,
as shown.
8
Insert the other end of heater power wire through the knockout in the side
of the heater assembly.
Secure the wire with an appropriately-sized strain
relief, if conduit is not used.
9
Connect the heater power wires to the top terminals of the heater assem-
bly’s terminal block and heater ground wires to the ground lug,
as shown.
Power Wires
(Gray - Customer
Supplied)
Ground Wires
(Green - Customer
Supplied)
Ground Wires
(Green/Yellow)
Insert the Power
Wires Here
IMPORTANT:
Always refer
to the wiring diagrams that
came with your HTC before
making electrical connec-
tions.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...