![Conair HTC 120 Скачать руководство пользователя страница 285](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067285.webp)
Cleaning the Cyclone Separator
(optional)
A filled cyclone separator barrel will negatively affect air flow and the
EnergySmart Drying System's efficiency. Cleaning frequency depends on how
much material you process and how dusty and full of fines it is.
NOTE:
Turn off the EnergySmart Drying System and allow it to cool before attempting
any maintenance.
1
Turn off and lock out the power to the EnergySmart Drying
System and its components.
2
Release the four (4) latches securing the cyclone separator barrel’s lid
by
pulling down on each latch. As the latches are released, a "hook" will still be
holding the lid to the barrel.
3
Lift up on the lid and release the "hooks" holding the lid to the barrel.
4
Empty any material from the barrel into an appropriate container.
Remove
any dust that clings to the inside of the barrel with a cleaning cloth.
5
Reinstall the lid
by engaging the barrel latch hooks. Once all for "hooks" are
engaged, lift up on the latches to secure the lid to the barrel.
M a i n t e n a n c e l
5-35
5
M
ai
n
te
n
an
ce
✐
Latch (4)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...