Preventative Maintenance
Checklist
Routine maintenance will ensure optimum operation and performance of the
EnergySmart™ Dryer System and its components. Conair recommends the
following maintenance schedule and tasks.
• Whenever changing materials
.
❒
Drain and clean the CH Hopper.
❒
Clean the optional receiver(s) that fills the hopper
(see the appropriate
receiver user guide.)
❒
Clean the optional receivers’ filter(s).
If you are running a dusty material or
regrind you may need to check and clean the screen filter more often. If the
material flow is erratic or sluggish, check the filter.
❒
Change the GasTrac’s setpoint. (If necessary)
❒
Change the HTC’s setpoint. (If necessary)
❒
Change the Drying Monitor’s setpoint entries on the control.
Verify that
the temperature settings are correct for the new material.
❒
Inspect the Drying Monitor probe and mounting assembly.
If the probe is
damaged, replace it. If vibration has loosened the probe’s mounting hardware,
tighten as necessary.
❒
Empty and clean the optional cyclone separator’s collecting tank.
❒
Empty and clean the optional dust collector’s dust filter.
✐
NOTE:
For detailed maintenance
instructions for the components
of the EnergySmart Dryer
System, refer to the individual
component manuals supplied
with the system.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...