Installing the Dwyer 641 Air
Velocity Transmitter
The Dwyer 641 Air Velocity Transmitter (AVT) supplied with the EnergySmart
Dryer System should be installed within 8 or 12 in. {203.2 or 304.8 mm}
customer-supplied pipe using a 5/16
×
1/4 in. NPT compression fitting.
IMPORTANT:
The AVT should be installed in a straight piece of pipe, on the
return air side of the EnergySmart Dryer. Conair recommends locating the
probe toward the end of long straight section of pipe to allow the air flow
as much length as possible to straighten out before it comes in contact
with the probe. Placing the probe too close to a transition or bend will
influence air flow readings.
To install the AVT:
1
Determine the best location to install the AVTs following the
recommendations above.
2
If Conair’s hard piping kit was not purchased with your system, drill and
tap
customer-supplied 8 or 12 in. {203.2 or 304.8 mm} 2 ft. {0.6 m} long pipe
with a 7/16 in. drill bit and 1/4 in. - 18 NPT tap.
AVT in Dryer Return
Air Circuit (Shown
with hard piping kit)
(continued)
3-42
l I n s t a l l a t i o n - P i p i n g / H o s e s
NOTE:
To order Conair's
optional hard piping kit for
your EnergySmart Dryer
System, contact your Conair
representative at: US 800-
458-1960, International
+1-814-437-6861.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...