3
In
st
al
la
tio
n
Installing the Conair GasTrac
Gas Line Sizing
Conair recommends that the customer contact a local contractor that can determine
the gas line size based on specific conditions.
The information below will be required for the contractor or gas supplier to make
the proper gas line selection:
1
The required inlet gas pressure to the GasTrac’s regulator must be less than 5
psig. Also, the incoming gas pressure should not vary more than 5" H
2
O
between no gas flow and maximum gas flow. The regulator on the GasTrac can
be used to adjust the supplied gas pressure to 7" H
2
O.
2
If an additional regulator is required to obtain the proper delivery gas pressure
(1 to 5 psig), the regulator must have an
ANSI Class 6 positive shut off
to pre-
vent gas pressure increase when the GasTrac is turned off.
The following chart is a listing of the maximum gas usage and inlet line size used
on each GasTrac.
GasTrac Model
Max Gas Flow (CFH) {CMH}
Inlet Line Size (NPT)
CGT150
150 {4.2}
3/4 in.
CGT250
250 {7.1}
3/4 in.
CGT350
350 {9.9}
3/4 in.
CGT500
500 {14.1}
3/4 in.
CGT700
700 {19.8}
1 in.
(continued)
NOTE:
Conair strongly recommends that a “drop tube” be utilized when piping the gas
line into the GasTrac. This will help to prevent any oil or metal shavings, created dur-
ing the installation process, from entering the GasTrac. If this action is not completed,
warranty on components in gas line will be voided.
✐
I n s t a l l a t i o n - G a s P i p i n g a n d E x h a u s t F l u e l
3-89
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...