Connecting the Energ ySmart Dr yer
Control to System Components
WARNING:
The EnergySmart Dryer
DOES NOT
have a central power switch to dis-
connect and lock out the main power to the system components. The power
MUST
BE
disconnected and locked out at each system component.
IMPORTANT:
Always refer to the wiring diagrams that came with your EnergySmart
Dryer and individual components before making electrical connections.
CAUTION:
Always disconnect and lock out the main power sources before making
electrical connections. Electrical connections should be made only by qualified
personnel.
There are two (2) types of connections between the EnergySmart Dryer control
and the components of the system:
•
Control system inter-connecting wiring
•
Communications inter-connecting wiring
The control system inter-connecting wiring consists of 24 VDC connections neces-
sary for the EnergySmart Dryer control to operate the system components.
The communications inter-connecting wire is a typical Modbus-485 "daisy chain"
used to read data from system components.
NOTE:
The communications interconnecting “daisy chain” wire starts at its connection
point at the EnergySmart Dryer control, then is connected to the other system compo-
nents.
NOTE:
All power going out from
the EnergySmart control panel to
the system components will be
24 VDC.
✐
ON
O
O
FF
NOTE:
Conair recommends the
connections between the
EnergySmart Dryer and system
components should be made
with properly sized conductors
and properly protected with
appropriate conduit (customer
supplied). The routing should be
neat and away from potential
mechanical damage.
✐
(continued)
✐
3
In
st
al
la
tio
n
I n s t a l l a t i o n - C o n t r o l & C o m m u n i c a t i o n W i r i n g l
3-75
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...