![Conair HTC 120 Скачать руководство пользователя страница 166](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067166.webp)
4-24
l O p e r a t i o n
Control Function Descriptions
(continued)
Screen 9 - Material Temperature Trending Screen (optional)
To access the Material Temperature Trending Screen (Screen 9):
1
Press the "Material Temp." button
located on in the center of the Trending Screen
(Screen 8).
The Material Temperature Trending screen allows the user to view the material temperature
trend vs. time at seven (7) locations in the CH Hopper. The temperature reading locations are
denoted by various colors and start at Location 6 (top of the hopper) and end with Location 1
(within the hopper cone) and Process Material Temp. (exiting the hopper). The colors associated
with the locations are:
Orange
= Process Material Temperature (Exiting the hopper)
Red
= DM Probe Temp. 1 (hopper cone)
Yellow
= DM Probe Temp. 2
Blue
= DM Probe Temp. 3
Purple
= DM Probe Temp. 4
Dark Green = DM Probe Temp. 5
Light Green = DM Probe Temp. 6 (Top of hopper).
The Material Temperature Trending screen shows a snap shot of the last two (2) hours of opera-
tion and records and saves trending data for the last 72-hour period. The scroll buttons near the
bottom of the screen allow the user to scroll back to an earlier time or forward to the present
time, plus jump to the present time from any time within the trending record.
The user can also view the other system parameters, start the system, stop the system, initiate a
system Cool Down or return to the "Login" screen by pressing the applicable buttons on the right
of the screen.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...