Connecting the Energ ySmart Dr yer
Control to System Components
(continued)
Connecting the Energ ySmart Dr yer System
Heat Source
The following sections give instructions for wiring the EnergySmart Drying
System components. Specific details for wiring your EnergySmart Dryer System
components is detailed in the wiring diagrams supplied with your system and the
individual components.
IMPORTANT:
Always refer to the wiring diagrams that came with your EnergySmart
Dryer System and the individual components before making electrical connections.
NOTE:
The connections between the EnergySmart electrical panel and the system compo-
nents should be made with properly-sized conductors and properly protected with appropri-
ate conduit (customer supplied). The routing should be neat and away from potential
mechanical damage.
GasTrac As Heat Source
NOTE:
If a HTC is used as the heat source in your EnergySmart Dryer System,
see Installation
section entitled, Connecting the EnergySmart Dryer Control to System Components, HTC As Heat
Source
CAUTION:
Always disconnect and lock out the main power sources before
making electrical connections. Electrical connections should be made only by
qualified personnel.
1
Disconnect and/or lock out main power
to the EnergySmart Dryer and the
GasTrac.
2
Open the door of the EnergySmart Dryer electrical panel and
determine the
location of the entry ports for the control system inter-connecting and the
communication inter-connecting wires.
3
Drill or cut the entry ports,
one for the inter-connecting wire and one for the
communication inter-connecting wire.
3b
If using electrical conduit, cut entry ports for both wires and then run
customer supplied conduit for each from the EnergySmart Dryer’s
electrical enclosure to the GasTrac’s electrical enclosure
.
✐
✐
3-76
l I n s t a l l a t i o n - C o n t r o l & C o m m u n i c a t i o n W i r i n g
IMPORTANT:
Always refer
to the wiring diagrams
that came with your
EnergySmart Dryer and
GasTrac before making
electrical connections.
(continued)
NOTE:
Do not run com-
munication and control
wires in the same con-
duit.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...