Connecting the Energ ySmart Dr yer
Control to System Components
(continued)
HTC As Heat Source
NOTE:
If a GasTrac is used as the heat source in your EnergySmart Dryer System,
see
Installation section entitled, Connecting the EnergySmart Dryer Control to System Components,
GasTrac As Heat Source.
CAUTION:
Always disconnect and lock out the main power sources before
making electrical connections. Electrical connections should be made only by
qualified personnel.
1
Disconnect and/or lock out main power
to the EnergySmart Dryer and the
HTC.
2
Open the door of the EnergySmart Dryer electrical panel and
determine the
location of the entry ports for the control system inter-connecting and the
communication inter-connecting wires.
3
Drill or cut the entry ports,
one for the inter-connecting wire and one for the
communication inter-connecting wire.
3b
If using electrical conduit, cut entry ports for both wires and then run
customer supplied conduit for each from the EnergySmart Dryer’s
electrical enclosure to the HTC’s electrical enclosure
.
4
Route the control system inter-connecting and communications inter-con-
necting wires from the EnergySmart Dryer electrical panel to the HTC
electrical panel.
5
If not using conduit, insert the control system inter-connecting and the
communication inter-connecting wires through their respected entry port.
Secure the wires with an appropriately-sized strain relief.
6
Connect the control system inter-connecting wiring of the HTC to the
EnergySmart Dryer electrical panel
as detailed in the supplied wiring dia-
gram.
✐
3-78
l I n s t a l l a t i o n - C o n t r o l & C o m m u n i c a t i o n W i r i n g
IMPORTANT:
Always refer
to the wiring diagrams
that came with your HTC
and EnergySmart system
before making electrical
connections.
(continued)
NOTE:
Do not run com-
munication and control
wires in the same con-
duit.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...