![Conair HTC 120 Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067036.webp)
Unpacking the Energ ySmart™
Dr yer System Components
Because of their size and shape and the multiple sizes in which the hopper is
available, the components of the EnergySmart Dryer System come packaged for
shipping in the best available manner. The EnergySmart System components
include, depending on the model and options ordered:
!
EnergySmart Dryer with TouchView Technology - Allen-Bradley control
!
CH Hopper - with or without integrated cyclone - optional
!
Heater (HTC or GasTrac)
!
Dust Collector(s) - optional
!
DM-II Drying Monitor
!
Receiver(s) - up to two (2) - optional
!
Vacuum pump - up to two (2) - optional
!
Hard piping kit - optional
1
For the EnergySmart Dryer System components that are mounted to
pallets,
remove the hardware securing each component to its pallet, then
remove the component from the pallet. With a forklift, hoist or crane carefully
move the components to their approximate installation locations.
2
Remove all packing material,
protective paper, tape and plastic, including any
inserted inside the components.
3
Carefully inspect all components
to ensure no damage occurred during ship-
ping, and that you have all the necessary hardware. If any damage is found,
notify the shipping agent immediately.
4
Take a moment to record serial numbers
and electrical power specifications
in the blanks provided on the back of the User Guide's title page. This informa-
tion will be helpful if you ever need service or parts.
5
You are now ready to begin installation.
Follow the preparation steps in the
next section.
6
Determine if your application is electric or gas. Disregard installation
steps for options not used.
3-6
l I n s t a l l a t i o n - G e n e r a l
NOTE:
Some components may
be strapped to their shipping
pallet, remove as necessary.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...