![Conair HTC 120 Скачать руководство пользователя страница 170](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067170.webp)
4-28
l O p e r a t i o n
(continued)
Control Function Descriptions
(continued)
Screen 13 - Differential Pressure Trending Screen (optional)
To access the Differential Pressure Trending Screen (Screen 13):
1
Press the "Differential Pressure" button
located on in the center of the Trending
Screen (Screen 8).
The Differential Pressure Trending screen allows the user to view the differential pres-
sure (PSI) trend vs. time of the EnergySmart Dryer. A dark green color is associated
with the Filter (Optional Dust Collector) Differential Pressure.
The Differential Pressure Trending screen shows a snap shot of the last two (2) hours
of operation and records and saves trending data for the last 72-hour period. The
scroll buttons near the bottom of the screen allow the user to scroll back to an earlier
time or forward to the present time, plus jump to the present time from any time with-
in the trending record.
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...