4
O
p
er
at
io
n
O p e r a t i o n l
4-35
Control Function Descriptions
(continued)
Screen 20 -Equipment Setup Screen
To access the Equipment Setup Screen (Screen 20):
1
Press the "Equipment Setup" button
located on the right side of Main Setup
Screen (Screen 19).
The Equipment Setup screen allows the user to access 13 equipment setup buttons.
Each button navigates the user to additional setup screens:
• Dry Air Setup
• VFD PID Setup
• Ethernet Setup
• Options Setup
• Instrument 1, 2 and 3 Setup
• Regen PID Setup
• Loader Setup (Primary)
• Test Outputs
• OptiMizer™ Setup
• Close HMI
• Loader Setup (Secondary), if applicable
The user can also view the other system parameters, start the system, stop the system,
initiate a system Cool Down or return to the "Login" screen by pressing the applicable
buttons on the right of the screen.
(continued)
NOTE:
User must push Login
screen first from all Setup
screens.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...