![Conair HTC 120 Скачать руководство пользователя страница 189](http://html.mh-extra.com/html/conair/htc-120/htc-120_user-manual_2649067189.webp)
4
O
p
er
at
io
n
O p e r a t i o n l
4-47
Control Function Descriptions
(continued)
Screen 32 - Close HMI Screen
To access the Close HMI Screen (Screen 32):
1
Press the "Close HMI” button
located on the Equipment Setup Screen
(Screen 20).
Pressing the “Close HMI” button will close the EnergySmart Dryer control software
program and return the user to the initial power-up start screen.
To restart the EnergySmart Dryer’s control interface:
1
Press twice on the FactoryTalkView ME Icon.
2
Touch the “Load Application” button.
3
Select the application. Typically, it is the only application listed.
4
Press the “Load” button.
5
When prompted, “Do you want to replace the terminal’s current communica-
tion configuration with the application’s communication”, press the “No” but-
ton.
6
Wait for the application to load. Approximately 90 seconds.
7
Press the “Run Application” button.
8
Wait for the application to run.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...