3-112
l I n s t a l l a t i o n - Te s t i n g
Testing the Installation
4
From the System Control Screen (Screen 16), press the “Start System”
button.
If everything is installed correctly:
•
The regeneration and process blowers turn on. If process blower does
not turn on, verify that the VFD is set to “Remote
•
The regeneration heater turns on.
•
The process heater will energize (HTC or GasTrac)
•
The dryer’s desiccant wheel starts turning. If the desiccant wheel does
not turn, verify that the desiccant wheel tie has been removed.
•
The loader and pump will come on (if supplied, and if loaders enabled).
5
From the System Control Screen (Screen 16), press the “Stop System”
button.
If everything is installed correctly:
•
The blowers will process and continue running as needed to cool the
heaters. (until regeneration heaters are less than 150°F{66°C})
6
The test is over.
If the dryer performed the normal operating sequences as
outlined, reconnect the material source to the optional hopper receiver and begin
normal operation. If it did not, refer to the
Troubleshooting section
of the User
Guide.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...