Testing the Installation of the HTC
1
Make sure there is no material in the CH Hopper.
If there is an optional
receiver mounted on the hopper, disconnect the material inlet hose at the source.
2
Turn off the main power to the HTC.
Check to ensure that the disconnect dial
is in the OFF position.
3
Perform a resistance test.
Check the resistance leg to leg and leg to ground to
make sure that each heater and blower are wired correctly. The three legs
should have equal resi/- 5%. The resistance to ground should be 20
megohms or higher.
See the Hopper Temperature Controller (HTC) manual for
this procedure.
4
Perform the following safety checks:
• Make sure all components are securely mounted
• Make sure all hoses are connected to the proper locations and secured with
hose clamps
• Make sure all sensors are properly installed and secured
• Make sure all wiring is secure and away from potential mechanical damage
• Make sure the hopper outlet is free from obstructions that would cause back
pressure in the drying hopper.
5
Start the EnergySmart Dryer,
see Installation section entitled, Checking for
Proper Air Flow.
Monitor the dryer during the first few minutes of operation to
verify that the start-up operating sequences are correct.
6
Turn on the main power to the HTC.
Check to ensure that the disconnect dial
is in the ON position. This powers up the control and the display lights will
illuminate.
ON
O
O
F
F
3-100
l I n s t a l l a t i o n - Te s t i n g
IMPORTANT:
The EnergySmart Dryer must be running to perform this test.
(continued)
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...