I n s t a l l a t i o n - Te s t i n g l
3-101
Testing the Installation of the HTC
(continued)
7
Adjust the HTC’s setpoint to the required hopper inlet temperature.
Use
the setpoint Adjust
▲
or
▼
buttons to set the temperature. Move the heater
enable switch to the “Enable” position. The temperature will begin rising to the
user-entered setpoint.
8
The “Heater” LED will flash and the temperature climbs towards the set-
point,
if everything is operating properly.
9
After the test has been completed successfully,
switch the heater enable
switch to “Standby”, then turn off the power to the HTC (allow HTC to
cool) and properly shut down the dryer,
see Operation section entitled,
Stopping the EnergySmart Dryer System.
Heaters
Startup /
Shutdown
For Startup:
1. With heaters in
Standby, turn on
blower or dryer.
2. Enable heaters.
For Shutdown:
1. Switch heaters to
Standby.
2. Wait 60 seconds
before turning off
blower or dryer.
Enable
Standby
NOTE:
When testing the HTC,
process protection should be
enabled in the HTC’s Control
menu This is especially impor-
tant if the insulated heater outlet
hose is extended or rerouted for
any reason.
✐
setpoint Adjust
Buttons
IMPORTANT:
The EnergySmart
Dryer must be running to per-
form this test.
NOTE:
Adjusting the HTC setpoint
and running this test can be
completed at the dryer by using
the Touchview screen, as long as
the green rocker switch is in the
“Enable” position.
✐
NOTE:
When connected to an
ES-1 System, the HTC must
operate in English units.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...