3-110
l I n s t a l l a t i o n - Te s t i n g
Configuring the DM-II Dr ying
Monitor
Setting Up the Drying Monitor-II (DM-II)
The EnergySmart Dryer control ships with the DM-II monitor software installed,
however, all of the functions are turned off by default to avoid nuisance alarms
created by improper setup.
To activate the DM-II monitor:
•
Set the dryer process air temperature;
•
Select an RTD for the alarm setpoint; and
•
Select the low temperature RTD sensor. (See the instructions supplied with the
DM-II monitor for more details).
Selecting the low temperature RTD sensor will automatically engage the DM-II.
Once the low temperature RTD is selected, the control will alert the operator if the
appropriate drying temperature is not reached within four (4) hours (default time).
NOTE:
If a change is made to the HTC or GasTrac, the DM-II will need to be reset. For more infor-
mation, refer to the supplied DM-II User’s manual.
Configuring the Level
(optional)
The optional level switch sensor monitors the amount of material inside the CH
Hopper and indicates to an optional receiver that a load cycle is required. If the
probe is not configured correctly, material level readings will be inaccurate.
Refer to the level switch’s manual for calibration instructions.
NOTE:
To understand the
navigation of the DM-II
control, see the Control flow
diagrams contained in the
supplied DM-II User's man-
ual.
✐
✐
NOTE:
Option must be enabled in Alarm Setup screen.
✐
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...