Location and Mounting of the
Vacuum Pump(s) and Dust
Collector(s)
(optional)
The optional vacuum pump(s) and associated dust collector(s) supplied with the
EnergySmart Dryer System are designed to be mounted to the floor and in any
convenient location near the CH Hopper.
1
Using a forklift, hoist or crane, move the vacuum pump(s) and associated
dust collector(s) to their installation location.
CAUTION:
To prevent accident and injury, move the vacuum pump(s) and associat-
ed dust collector(s) to their locations by using a forklift, hoist or crane.
2
Position the equipment so that the main power supply, communication
cables and conveying lines can be connected easily.
IMPORTANT:
You will need to consider the location of all EnergySmart Dryer
System components to properly install the vacuum pump(s) and associated dust
collector(s).
3
Secure the vacuum pump(s) and associated dust collector(s) to their
mounting locations on the floor by using the holes in the base of each
component.
Ensure that the mounting method meets all local, regional and
national codes and regulations.
3-30
l I n s t a l l a t i o n - G e n e r a l
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...