Problem
Primary Loader No
Material Alarm
- The
demand sensor located at the
optional material receiver has
not been satisfied after three
(3) attempts.
Secondary Loader No
Material Alarm
- The
demand sensor located at the
optional material receiver has
not been satisfied after three
(3) attempts.
Possible cause
The sensor is not adjusted properly.
No material is being conveyed.
The conveying load time is too short.
Conveying blower is not coming on.
The conveying filter is clogged.
Hoses have come off or are loose in the
conveying loop.
The air operated valves are not operat-
ing.
The sensor is not adjusted properly.
No material is being conveyed.
The conveying load time is too short.
Conveying blower is not coming on.
The conveying filter is clogged.
Hoses have come off or are loose in the
conveying loop.
The air operated valves are not operat-
ing.
Solution
Adjust the sensor as needed.
Check material supply.
Increase the load time setpoint.
Check the blower fuses in the control
and the overload settings.
Clean or replace the conveying filter.
Check for loose hoses and make sure all
hose clamps are secure.
Make sure compressed air is connected
and that the solenoid valves are operat-
ing properly.
Adjust the sensor as needed.
Check material supply.
Increase the load time setpoint.
Check the blower fuses in the control
and the overload settings.
Clean or replace the conveying filter.
Check for loose hoses and make sure all
hose clamps are secure.
Make sure compressed air is connected
and that the solenoid valves are operat-
ing properly.
6-24
l Tr o u b l e s h o o t i n g
Passive Alarms
If an alarm occurs, a red dialog box is displayed on the dryer’s touch screen
control. The dryer continues to operate, but this problem could prevent cor-
rect drying of your material. The dialog box will indicate whether the alarm
is a shut down alarm or a passive alarm.
Содержание HTC 120
Страница 10: ...viii l Table of Contents ...
Страница 30: ...2 14 l Description ...
Страница 35: ...Installation General Installation General l 3 5 3 I n s t a l l a t i o n ...
Страница 65: ...Installation Hard Piping Kits Installation Piping Hoses l 3 35 3 I n s t a l l a t i o n ...
Страница 80: ...3 50 l Installation Piping Hoses ...
Страница 81: ...3 I n s t a l l a t i o n Installation Main Power Connections Installation Main Power Connections l 3 51 ...
Страница 88: ...3 58 l Installation Piping Hoses ...
Страница 89: ...3 I n s t a l l a t i o n Installation Main Power Connections l 3 59 Installation Conveying Lines ...
Страница 92: ...3 62 l Installation Conveying Lines ...
Страница 93: ...Installation Water Lines 3 I n s t a l l a t i o n Installation Water Lines l 3 63 ...
Страница 115: ...Installation Compressed Air Lines 3 I n s t a l l a t i o n Installation Compressed Air Lines l 3 85 ...
Страница 124: ...3 94 l Installation Gas Piping and Exhaust Flue ...
Страница 125: ...Installation Testing 3 I n s t a l l a t i o n Installation Testing l 3 95 ...
Страница 149: ...4 O p e r a t i o n Operation l 4 7 Control Function Flow Charts continued Operation Flow Chart 1 1A 2 3 4 continued 5 ...
Страница 152: ...Control Function Flow Charts continued Setup Flow Chart 1 1B 19 38 20 34 37 4 10 l Operation continued ...
Страница 250: ...4 108 l Operation ...
Страница 286: ...5 36 l Maintenance ...